Off-grid homes and communities · Kazakhstan

A home that makes its own power, heat and water

TUTO designs and develops energy-efficient off-grid homes and residential communities with no connection to central utility grids. Solar generation, a private well, biological wastewater treatment with no discharge to sewers or water bodies, and one control system for everything.

0connections to central power, gas, heating and water grids
TUTO off-grid community, visualisationTUTO pilot community · visualisation

The TUTO idea

Dynamic calm

A TUTO home works around the clock. Solar modules generate power, storage carries the energy through nights and overcast days, a heat pump heats the home, a private well supplies water. Inside you hear none of it: quiet, even warmth in winter and summer.

Systems in motion, people at rest.

There is nothing to pay the grid, because there is no grid connection. The time and effort stay with the family and its work.

Energy

Solar modules, storage for nights and winter. The home produces what it uses.

Strength

Monolithic walls in VELOX permanent formwork, designed for seismic intensity 9 (MSK-64). Over 25 years in construction.

Creation

Architecture and engineering are designed together, for the site, the climate and the family.

Community

A TUTO village runs as one household: a shared energy system, a kindergarten, a health centre. To join the community is to become a resident of a TUTO village.

TUTO Base Passport standard

Every resource is produced on site

One set of requirements for an off-grid property. Homes and communities run with no connection to central utility grids all year round, and all building systems are brought into a single control system.

Power

Solar modules. Energy storage covers nights and overcast days.

solar generation · storage

Heat without gas

Heating and hot water come from heat pumps running on the site’s own generation.

heat pumps

Own water

Water from a private well, treated on site according to the water analysis.

well · water treatment

Wastewater

Domestic wastewater is treated biologically on site. Nothing goes to sewers or water bodies.

biological treatment · no discharge

Energy-efficient off-grid home

Monolithic walls with continuous insulation cut heat loss to the level where off-grid living makes economic sense.

200 mm wall insulation · twice the Almaty requirement

Control

All equipment is connected to one dispatch system. Residents and the operator see every system in a mobile app.

industrial Modbus protocol

Technology

A warm monolithic wall

Load-bearing walls are cast in place inside VELOX permanent formwork made of wood-chip cement boards. The formwork stays in the structure as part of the wall, and the insulation runs as a continuous layer with no thermal bridges.

Autonomy passport

Power supplySolar generation and storageoff-grid
HeatingHeat pumpsoff-grid
Water supplyPrivate welloff-grid
WastewaterBiological treatment, no discharge to sewers or water bodiesoff-grid
Gas supplyNot required
ControlSingle dispatch system, Modbus
External wallmonolithic concrete in permanent VELOX formwork, 200 mm insulation, thermal protection twice the Almaty requirement
Roof350 mm insulation
TUTO wall section: VELOX board 35 mm, reinforced concrete 150 mm, insulation 120 mm, VELOX board 35 mm
  • Wood-chip cement board, outer35 mm
  • Expanded polystyrene, continuous layer120 mm
  • Reinforced concrete, load-bearing150 mm
  • Wood-chip cement board, inner35 mm
2×TUTO standard: 200 mm wall insulation — thermal protection twice the Almaty requirement
4.076R, m²·K/W · completed VELOX buildings: 340 mm wall, 120 mm insulation

The code requirement for external walls of homes in Almaty is about 2.5 m²·K/W. The TUTO standard provides twice that: in an off-grid home every kilowatt saved in winter means fewer solar modules and smaller energy storage.

No condensation forms inside the 340 mm wall. The water vapour pressure calculation (+20 °C inside, −26 °C outside) shows actual pressure below saturation pressure across the full thickness, so the wall stays dry and the insulation keeps its properties.

Track record

The technology already works on our buildings

TUTO walls use the same technology we have used to build seven buildings in Kazakhstan. All timeframes are in working days.

7buildings — 2,430 m² in Kazakhstan since 2013
45working days — monolithic shell ready for finishing, at most
9seismic intensity (MSK-64) — design for every building
25+years in construction
Akzhar · 2013 · 2 × 600 m²

Akzhar · 2013 · 2 × 600 m²

Office and house — shells ready for finishing in 37 working days

Aralsk · 2014 · 210 m²

Aralsk · 2014 · 210 m²

House-museum — turnkey, finishing included, in 47 working days

Tuzdybastau · 2015 · 280 m²

Tuzdybastau · 2015 · 280 m²

House — shell under roof

Koyankus · 2023 · 130 m²

Koyankus · 2023 · 130 m²

House

All projects — velox.kz →

Pilot project

“Gorodok” — the first community by TUTO

The first community under the TUTO Base Passport standard: 13 homes and a community building with no grid connection. Solutions proven here are carried over to the next communities. The project is under way: the master plan scheme and the technical solutions for off-grid infrastructure are complete.

Street of the TUTO pilot community, visualisationVisualisation
Kindergarten and health centre, visualisationKindergarten · visualisation
Solar modules and control building, visualisationEnergy · visualisation
The community in winter, visualisationWinter · visualisation

13 homes

Semi-detached and detached homes to the TUTO standard: 200 mm wall insulation, 350 mm roof insulation.

Kindergarten and health centre

The community building: one storey, separate zones and entrances, its own playground.

100% off-grid

Solar modules and storage, private well, biological treatment with no discharge to sewers or water bodies. No grid connections.

Showroom

In the control building partners, students and buyers see every system working in real time.

  1. Land and baseline datasite, permitted use, surveys
  2. Designarchitecture and off-grid building systems
  3. Building permitstate review and approvals
  4. Shell of the first housemonolithic walls in permanent formwork
  5. Building systemspower, heat, water, treatment, dispatch
  6. Commissioningand start of off-grid systems monitoring

Model

How the project is structured

The standard, the trademark and the engineering sit in the holding company. Each property gets its own project company, which land partners and investors join. Construction is carried out by a general contractor under contract.

AIFC participant

TUTO Off-Grid Development Ltd

TUTO Base Passport standard, design and engineering, selection of equipment and the general contractor, acceptance.

one per cluster

Project company

Owns the property. Land partners and investors join here. Buys equipment directly from manufacturers.

under contract

General contractor

Builds under contract with the project company and works with local subcontractors.

Team

The project team

The founder and partners responsible for the technology, architecture and seismic safety of TUTO properties.

Sergey Tregubenko

Sergey Tregubenko

Founder of TUTO and VELOX KZ

More than 25 years in construction, over 100,000 m² of construction and finishing works. Has led VELOX KZ since 2014.

Sergey Glebov

Sergey Glebov

Architect, project partner

More than 120 completed residential projects; earthquake-resistant structures.

Anvar Shapanov

Anvar Shapanov

PhD (Eng.), structural engineer, project partner

About 200 designed projects; design of earthquake-resistant structures.

TUTO ORDA

A team that grows with the project

A programme that selects and trains specialists from students and graduates of Almaty universities. Participants work on a real site, from baseline data to commissioning, and stay with the team for the next projects.

ArchitectureStructuresHVACWater and drainageEnergy and renewablesAutomationBIMCost estimatingSurveyingSite supervisionEconomicsLaw

Next step

How to start

1

Request

Leave your contact and tell us briefly what role you see for yourself.

2

Meeting and site visit

We show completed VELOX buildings and the production facility in Almaty and walk through the technology.

3

Materials

The open presentation is on the website. For investors — the full version and preliminary estimate; for landowners — terms of participation.

Partners

Join the project

Landowners

A site can be contributed to the project company of a specific property. We consider sites across Kazakhstan.

Financial institutions

Banks, green finance funds and energy-efficiency programmes. The properties cut energy use and CO₂ emissions.

Equipment manufacturers

Solar modules, storage, heat pumps, water treatment, biological treatment, Modbus-compatible automation.

Universities

Student internships, thesis work on a real site, monitoring data from off-grid systems.

FAQ

The essentials

What is TUTO?

Homes and communities that run with no grid connection: power from on-site solar generation with storage, heat from heat pumps, water from a private well, wastewater through biological treatment, with no discharge to sewers or water bodies. All equipment is brought into one control system.

What stage is the first community at?

“Gorodok” — 13 homes, a kindergarten and a health centre. The master plan scheme and technical solutions for off-grid infrastructure are complete, and baseline data for design is being prepared. Design is carried out by the TUTO ORDA team.

What are TUTO homes built from?

Monolithic walls in VELOX permanent formwork, the same technology used for our seven buildings in Kazakhstan. Wall insulation 200 mm, roof insulation 350 mm. Structures are designed for seismic intensity 9 (MSK-64).

What happens in winter when there is little sun?

The community is designed for the darkest month of the year. Insulated walls and roofs cut heat demand, energy storage covers nights and overcast days, and an on-site backup source runs only during long spells of bad weather.

I own land. How can I offer a site?

Send a request or write to sergey@tutooffgrid.com with the location, area and permitted use of the site. A site can be contributed to the project company of a specific community; terms are discussed after we see the site.

How can I discuss taking part in the project?

Send a request on the website. After an introduction we send investors a two-page project overview.

Can a university become a partner?

Yes, through the TUTO ORDA programme: student internships, thesis work on a real site, monitoring data from off-grid systems.

For private clients

A TUTO home on your plot

A fully autonomous one- or two-storey detached home on your plot designated for individual housing construction. No connection to centralised utility systems: power, heat, water and wastewater treatment are provided within the site boundary.

What it is

  • A detached home on the owner's individual housing plot. The layout follows your brief.
  • Monolithic reinforced concrete walls and floor slabs cast in permanent formwork. The VELOX technology has been used in Kazakhstan since 2013.
  • Structural design of every home for seismic intensity 9.

Engineering within the site boundary

  • Power — solar modules and battery energy storage.
  • Heat — a heat pump running on on-site generation.
  • Water — a private borehole and water treatment.
  • Wastewater — biological treatment, no discharge to sewers or water bodies.
  • A single automation and dispatch system on the Modbus protocol, controlled from a mobile app.

Why it is convenient

  • No waiting for utility connections: no off-site utility networks are built and no connection permits are requested.
  • Suitable for plots without utilities.
  • Local outages do not affect the home.
  • One contract from site survey to handover: general contractor VELOX KZ LLP; surveys and design by licensed partners.
7 buildings, 2,430 m²built with the VELOX technology in Kazakhstan since 2013
≤ 45 working daysmonolithic shell ready for finishing on VELOX projects
9seismic intensity used in the structural design of every home
2×thermal protection twice the Almaty requirement

How to start — three steps

1

Request

Leave your name and contact in the request form, or write to sergey@tutooffgrid.com / WhatsApp +7 701 697 00 24.

2

Reply

We will ask a few questions about your plot. No documents or address are needed.

3

Meeting and site survey

We agree on a site visit, followed by a concept design and a proposal.

Permitting, system configuration and timing are determined for each plot after a site survey. This information is not an offer. TUTO is a trademark registered in the Republic of Kazakhstan, No. 97440.

Contact

Tell us what role you see for yourself in the project

We reply personally.

Send a request

Or send a request via Yandex Business →

Office3 Baisultanov St, Akzhar, Almaty 050027, Kazakhstan